Calendar Page of the Report Wizard

Use this page to define the calendar set to use in displaying the reporting periods for the data in the report. You can choose an existing calendar or select periods manually.

Note: This page displays only if you select a project file to run the report against and if the wizard supports the selection of a calendar set. Some reports use a predefined calendar set that does not require you to make a calendar selection.

If you select periods manually, you cannot save the report.

Contents

Field Description
Select Calendar Set Click to select a calendar set. You can choose from a list of all calendar sets defined in the project's fiscal calendar file. If you select a master project, the list displays sets from the calendar file associated with the master project.
The report's calendar periods are based on the periods defined in this set.
Select periods Manually Select this option to select dates from a list. The periods displayed in the list are determined by the periods defined and labeled in the base calendar set 00.

You must select at least one date to proceed to the next page. You can select more than one date.

First period includes cumulative data Select this checkbox to specify whether the first period in the calendar set or the manual selection should include data for only that period or cumulative data from the beginning of the project.